Menu

Handrail replacement

 

As part of Marina Developments Limited’s on going strive for the safest possible workplace,  ML DREDGING were asked to supply and fit extra safety rails between the piles inside the hoist dock of Mercury Yacht Harbour on the river Hamble.

To make sure our fabricator/welders were safe whilst fitting the new guard rails we mobilized our small multi-role vessel ‘SEAKA’ to be used as a safe working platform.  The footprint of this vessel is only 4m x 10m making it ideal to slip into tight spaces.

6 new rails were fitted in under 2 days and the marina staff are happy that they now have extra safety whilst operating in the hoist dock.

The ‘SEAKA’ is aviailable for charter with or without crew.

Seaka Multicat
Seaka Multicat
Seaka Multicat
Seaka Multicat

News

Witton Dredger
Dredging at Newhaven Marina
Dredging at Newhaven Marina

    ML Dredging have mobilized to Newhaven Marina to undertake the first stage of the marinas dredging campaign. The […]

Read full story
Dredging Trafalgar Wharf
Dredging at Trafalgar Wharf
Dredging at Trafalgar Wharf

  ML DREDGING have been mobilized to Trafalgar Wharf in Porchester to carry out some maintenance dredging of the approach […]

Read full story
Seaka Multicat
Handrail replacement
Handrail replacement

  As part of Marina Developments Limited’s on going strive for the safest possible workplace,  ML DREDGING were asked to […]

Read full story
View All
Back to top