Menu

Handrail replacement

 

As part of Marina Developments Limited’s on going strive for the safest possible workplace,  ML DREDGING were asked to supply and fit extra safety rails between the piles inside the hoist dock of Mercury Yacht Harbour on the river Hamble.

To make sure our fabricator/welders were safe whilst fitting the new guard rails we mobilized our small multi-role vessel ‘SEAKA’ to be used as a safe working platform.  The footprint of this vessel is only 4m x 10m making it ideal to slip into tight spaces.

6 new rails were fitted in under 2 days and the marina staff are happy that they now have extra safety whilst operating in the hoist dock.

The ‘SEAKA’ is aviailable for charter with or without crew.

Seaka Multicat
Seaka Multicat
Seaka Multicat
Seaka Multicat

News

BIG RON
MULTICAT ‘BIG RON’ JOINS THE FLEET
MULTICAT ‘BIG RON’ JOINS THE FLEET

  We are very proud to announce the arrival of BIG RON multicat to the fleet. Having been on the […]

Read full story
Dredging Brighton Marina
55,000m3 dredge at Brighton Marina
55,000m3 dredge at Brighton Marina

  ML (UK) DREDGING LTD have been awarded the contract for the removal of 55,000m3 of naturally deposited sand and […]

Read full story
Back at it in Gosport Marina.
Back at it in Gosport Marina.

  ML Dredging are back at Gosport Marina! ML have yet again been awarded the dredging contract for Gosport Marinas […]

Read full story
View All
Back to top