Menu

Royal Naval Sailing Association and Hornet Sailing Club

 

 

ML Dredging have been in Haslar Creek, Gosport carrying out maintenance dredging for the Royal Naval Sailing Association and Hornet Sailing Club.

Carrying out these works along side the imposing HMS Alliance submarine the powerful backhoe dredger ”Witton II” worked with our Split hopper barge Split 2 to take over 10,000 cubic metres of silt to the Nab spoil ground.

We were very grateful to the hard working staff that were very accommodating and made sure all dredge areas were clear and ready for our arrival.

 

Dredging at RNSA and Hornet Sailing Club
Dredging at RNSA and Hornet Sailing Club

News

Dredging Ineos Camber Portsmouth
Dredging for INEOS RACE TEAM UK
Dredging for INEOS RACE TEAM UK

‘Boxer’ dredger along with Split hopper barge ‘Split Two’ have arrived at the Camber docks in Portsmouth Harbour to carry […]

Read full story
Witton Dredger
Newhaven Harbour dredge.
Newhaven Harbour dredge.

  ML (UK) Dredging were pleased to be invited by Newhavens Harbour Master to carry out dredging works in the […]

Read full story
brighton marina dredging
Dredging Brighton Marina
Dredging Brighton Marina

  ML (UK) DREDGING were very proud to have been awarded the 2019 dredging campaign at Brighton Marina. The contract […]

Read full story
View All
Back to top