Menu

Dredging at Trafalgar Wharf

 

ML DREDGING have been mobilized to Trafalgar Wharf in Porchester to carry out some maintenance dredging of the approach channel to the ship lift and dry stack.

The Witton II and Split 2 have been working tidal shifts to return the channel to better working depths.

A volume of around 5,000m3 is expected to be removed.

Dredging porchester
Dredging porchester
Dredging Trafalgar Wharf
Dredging Trafalgar Wharf

News

Dredging Ineos Camber Portsmouth
Dredging for INEOS RACE TEAM UK
Dredging for INEOS RACE TEAM UK

‘Boxer’ dredger along with Split hopper barge ‘Split Two’ have arrived at the Camber docks in Portsmouth Harbour to carry […]

Read full story
Witton Dredger
Newhaven Harbour dredge.
Newhaven Harbour dredge.

  ML (UK) Dredging were pleased to be invited by Newhavens Harbour Master to carry out dredging works in the […]

Read full story
brighton marina dredging
Dredging Brighton Marina
Dredging Brighton Marina

  ML (UK) DREDGING were very proud to have been awarded the 2019 dredging campaign at Brighton Marina. The contract […]

Read full story
View All
Back to top