Menu

Dredging at Trafalgar Wharf

 

ML DREDGING have been mobilized to Trafalgar Wharf in Porchester to carry out some maintenance dredging of the approach channel to the ship lift and dry stack.

The Witton II and Split 2 have been working tidal shifts to return the channel to better working depths.

A volume of around 5,000m3 is expected to be removed.

Dredging porchester
Dredging porchester
Dredging Trafalgar Wharf
Dredging Trafalgar Wharf

News

BIG RON
MULTICAT ‘BIG RON’ JOINS THE FLEET
MULTICAT ‘BIG RON’ JOINS THE FLEET

  We are very proud to announce the arrival of BIG RON multicat to the fleet. Having been on the […]

Read full story
Dredging Brighton Marina
55,000m3 dredge at Brighton Marina
55,000m3 dredge at Brighton Marina

  ML (UK) DREDGING LTD have been awarded the contract for the removal of 55,000m3 of naturally deposited sand and […]

Read full story
Back at it in Gosport Marina.
Back at it in Gosport Marina.

  ML Dredging are back at Gosport Marina! ML have yet again been awarded the dredging contract for Gosport Marinas […]

Read full story
View All
Back to top