Menu

Dredging alongside HMS Warrior

ML DREDGING have arrived in Portsmouth alongside HMS Warrior to carry out dredging operations for the Portsmouth Naval Base property trust.

The small pontoon which caters to a few small boats and the ferry which runs back and forth to the explosives museum at Priddy’s Hard requires maintenance dredging to get back to required depths.

Being a Portsmouth based company we are very proud to be invited to carry out the dredge.  Our sister company ML (UK) Engineering is currently working next to us on HMS WARRIOR renewing the bulwarks around the whole of the top deck.

In the distance you can see the Spinnaker Tower, another project which ML (UK) had a lot of involvement including the fabrication of the spire, the top 100ft above the spectacular viewing platform.

 

 

 

News

Dredging Ineos Camber Portsmouth
Dredging for INEOS RACE TEAM UK
Dredging for INEOS RACE TEAM UK

‘Boxer’ dredger along with Split hopper barge ‘Split Two’ have arrived at the Camber docks in Portsmouth Harbour to carry […]

Read full story
Witton Dredger
Newhaven Harbour dredge.
Newhaven Harbour dredge.

  ML (UK) Dredging were pleased to be invited by Newhavens Harbour Master to carry out dredging works in the […]

Read full story
brighton marina dredging
Dredging Brighton Marina
Dredging Brighton Marina

  ML (UK) DREDGING were very proud to have been awarded the 2019 dredging campaign at Brighton Marina. The contract […]

Read full story
View All
Back to top