Dredging Bray marina Windsor

ML DREDGING have been invited to Bray Marina to carry out some redundant pontoon removal and shore based maintenance dredging.  This idealic marina in Windsor has to be one of the most peaceful tranquil marinas on the Thames and we are delighted to be entrusted with the following excavation tasks.

Using our 30 tonne long reach excavator we created a bunded pit on land.  The area created was to cater for 300 cubic metres of material to be deposited.

Our long reach excavator using all of the 18m reach she has to offer then dredged from the marina to the required depth and deposited the material into the bunded area we created.

Dredging Bray Marina

Once we had taken care of the dredging it was down to our plough boat ”Beaver” rigged up with a 2 metre wide plough frame which gets lowered to the required depth and pulled along the marina bed to ensure we have reached our dredge targets.

All operations were carried out and completed within two weeks and we thank the staff at Bray marina for their support throughout the dredge.

If you are interested in berthing your boat at Bray marina check out the link below!

http://www.mdlmarinas.co.uk/mdl-bray-marina

News

brighton marina dredging
Dredging Brighton Marina
Dredging Brighton Marina

  ML (UK) DREDGING were very proud to have been awarded the 2019 dredging campaign at Brighton Marina. The contract […]

Read full story
Witton Dredger
Dredging at Newhaven Marina
Dredging at Newhaven Marina

    ML Dredging have mobilized to Newhaven Marina to undertake the first stage of the marinas dredging campaign. The […]

Read full story
Dredging Trafalgar Wharf
Dredging at Trafalgar Wharf
Dredging at Trafalgar Wharf

  ML DREDGING have been mobilized to Trafalgar Wharf in Porchester to carry out some maintenance dredging of the approach […]

Read full story
View All
Back to top