Menu

Dredging at Newhaven Marina

 

 

ML Dredging have mobilized to Newhaven Marina to undertake the first stage of the marinas dredging campaign.

The backhoe dredger ‘Witton II’ will undertake the first stage of the project, removing roughly 8,000 cubic meters in the first of 4 stages.

The ‘Witton II’ will be working alongside hopper barges Split Two or Split Three to achieve maximum spoil removal in the shortest possible time. Bringing the least amount of disruption to the Marina and berth holders.

Newhaven Marina have worked hard over the past weeks to remove pontoon infrastructure to allow us access into the marina. Although our skippers will still be operating in extremely confined space, highlighting once again the skill of our crews.

 

For all berthing inquiries at Newhaven Marina please find all contact and marina information on their website: http://www.newhavenmarina.co.uk/

News

BIG RON
MULTICAT ‘BIG RON’ JOINS THE FLEET
MULTICAT ‘BIG RON’ JOINS THE FLEET

  We are very proud to announce the arrival of BIG RON multicat to the fleet. Having been on the […]

Read full story
Dredging Brighton Marina
55,000m3 dredge at Brighton Marina
55,000m3 dredge at Brighton Marina

  ML (UK) DREDGING LTD have been awarded the contract for the removal of 55,000m3 of naturally deposited sand and […]

Read full story
Back at it in Gosport Marina.
Back at it in Gosport Marina.

  ML Dredging are back at Gosport Marina! ML have yet again been awarded the dredging contract for Gosport Marinas […]

Read full story
View All
Back to top