Menu

Dredging at Newhaven Marina

 

 

ML Dredging have mobilized to Newhaven Marina to undertake the first stage of the marinas dredging campaign.

The backhoe dredger ‘Witton II’ will undertake the first stage of the project, removing roughly 8,000 cubic meters in the first of 4 stages.

The ‘Witton II’ will be working alongside hopper barges Split Two or Split Three to achieve maximum spoil removal in the shortest possible time. Bringing the least amount of disruption to the Marina and berth holders.

Newhaven Marina have worked hard over the past weeks to remove pontoon infrastructure to allow us access into the marina. Although our skippers will still be operating in extremely confined space, highlighting once again the skill of our crews.

 

For all berthing inquiries at Newhaven Marina please find all contact and marina information on their website: http://www.newhavenmarina.co.uk/

News

Dredging Ineos Camber Portsmouth
Dredging for INEOS RACE TEAM UK
Dredging for INEOS RACE TEAM UK

‘Boxer’ dredger along with Split hopper barge ‘Split Two’ have arrived at the Camber docks in Portsmouth Harbour to carry […]

Read full story
Witton Dredger
Newhaven Harbour dredge.
Newhaven Harbour dredge.

  ML (UK) Dredging were pleased to be invited by Newhavens Harbour Master to carry out dredging works in the […]

Read full story
brighton marina dredging
Dredging Brighton Marina
Dredging Brighton Marina

  ML (UK) DREDGING were very proud to have been awarded the 2019 dredging campaign at Brighton Marina. The contract […]

Read full story
View All
Back to top