Dredging at Newhaven Marina

 

 

ML Dredging have mobilized to Newhaven Marina to undertake the first stage of the marinas dredging campaign.

The backhoe dredger ‘Witton II’ will undertake the first stage of the project, removing roughly 8,000 cubic meters in the first of 4 stages.

The ‘Witton II’ will be working alongside hopper barges Split Two or Split Three to achieve maximum spoil removal in the shortest possible time. Bringing the least amount of disruption to the Marina and berth holders.

Newhaven Marina have worked hard over the past weeks to remove pontoon infrastructure to allow us access into the marina. Although our skippers will still be operating in extremely confined space, highlighting once again the skill of our crews.

 

For all berthing inquiries at Newhaven Marina please find all contact and marina information on their website: http://www.newhavenmarina.co.uk/

News

Dredger arrival
New marina – EAST COWES
New marina – EAST COWES

Dredging works have began at East Cowes for a brand new marina. Our Multicat ‘BIG RON’ towed our larger dredger […]

Read full story
BIG RON
MULTICAT ‘BIG RON’ JOINS THE FLEET
MULTICAT ‘BIG RON’ JOINS THE FLEET

  We are very proud to announce the arrival of BIG RON multicat to the fleet. Having been on the […]

Read full story
Dredging Brighton Marina
55,000m3 dredge at Brighton Marina
55,000m3 dredge at Brighton Marina

  ML (UK) DREDGING LTD have been awarded the contract for the removal of 55,000m3 of naturally deposited sand and […]