ML DREDGING were fortunate enough to be invited to dredge this picturesque marina in the heart of Emsworth.
Never shy of a challenge, we were very excited to put our new shallow draft equipment to work.
Our versatile modular pontoon BOXER fitted with a long reach excavator and our shallow draft hoppers MUDDER 1 and 2 worked together to bring this beautiful marina back to the desired depths.
Removing around 10,000 cubic metres of silt over nearly 5 month. We are happy to announce the completion of works.

For more information on berthing at Emsworth Yacht Harbour contact them at: